(1.中南工業(yè)大學(xué)資源環(huán)境與建筑工程 學(xué)院, 長(zhǎng)沙 410083;
2.銅陵 新橋硫鐵礦,銅陵244000)
摘 要: 通過(guò)大型采場(chǎng)模型模擬試驗(yàn),得出了塊石膠結(jié)充填新工藝實(shí)施中的關(guān)鍵技術(shù)與參數(shù)。據(jù)此,在銅陵新橋硫鐵礦建成了一套較為完備的塊石膠結(jié)充填系統(tǒng),并投入了生產(chǎn),大大改善了第二步回采的安全,每年可節(jié)約充填材料成本達(dá)420~500萬(wàn)元,經(jīng)濟(jì)效益顯著。 該成果將為類(lèi)似礦山采用這一技術(shù)提供了成功的借鑒經(jīng)驗(yàn)。
關(guān)鍵字: 塊石 膠結(jié)充填 新橋硫鐵礦
(1.College of Resource, Environment and Civil Engineening Central South University of Technology, Changsha 410083 ;
2.Xinqiao Pyrite Mine, Tongling 244000)
Abstract:A qualified cemented rockfill system has been developed in Xinqiao Pyrite Mine according to the key techniques and parameters of cemented rockfill derived from the model test of large stope. The cemented rockfill technique adopted has strengthened the safety of mining and reduced the fill cost about 4.2~5.0 million Yuan per year. The researching result provides a good example for the similar mines to use the technique.
Key words: rock fragment cemented rockfill Xinqiao Pyrite Mine